Works on Bezdan Lock and Šebešfok Sluice and Lock within the Complex Water Management Development of the Area of the Baja-Bezdan Canal
The subject is works on reconstruction and reparation of Bezdan lock and works on reparation and upgrade of warehouse and adaptation of Šebešfok lock. All works will be realized at 2 locations in West Backa District, AP Vojvodina, according to Serbian law.
First group of works is Reconstruction of the chamber, heads, pre ports, double doors, auxiliary shaft closures, portal crane, lock lighting, semaphore signalization, earthing installation, electric shock protection, cable distribution on Bezdan lock.
Second group of works is Reparation of the chamber, heads, concrete parts, underwater walls, wild vegetation removal, double door gates, gate wings, weir stop logs and their mechanism, portal crane and Moisture protection and upgrading of the facility — a command center, parking space, electricity supply, automation cabinet, control panel, visual inspection system, semaphores, water level measuring system on Šebešfok lock.
Bezdan and Sebesfok, West Backa District, Province of Vojvodina, Republic of Serbia
The subject of the contract are works on reconstruction of Bezdan lock and works on reparation and upgrade of warehouse/depot and adaptation of Šebešfok lock. All works will be realized at 2 locations in West Backa District, AP Vojvodina, according to Serbian law.
First group of works is Reconstruction of the chamber, heads, pre ports, double doors, auxiliary shaft closures, portal crane, lock lighting, semaphore signalization, earthing installation, electric shock protection, cable distribution on Bezdan lock. First group of works are related to execution of reconstruction works on the structure/facility of the ship lock Bezdan as follows:
(a) Subject of the contract.
Subject of the contract are the works on reconstruction of structures of the ship lock Bezdan. The structures/facility that the works are going to be executed on include:
— ship lock and stop logs storage/depot.
On both structures/facilities it is planned to execute the following works:
— construction works,
— mechanical engineering works,
— electrical engineering works;
(b) Investor — PWMC “Vode Vojvodine“, Novi Sad, Bulevar Mihajla Pupina 25;
(c) Place of execution of the works - Land plots 8076, 8077, Cadastral Municipality Bezdan;
(d) Project documentation:
— The Performing Design – Reconstruction of the ship lock Bezdan,
— The Performing Design – Reconstruction of the stop logs storage/depot adjacent to the ship lock Bezdan,
— The projects have been elaborated by “Energoprojekt – Hidroinženjernig“ Belgrade and University of Novi Sad Faculty of Technical Sciences.
Subject of the contract are the works on rehabilitation of structures/facilities of the sluice and ship lock Šebešfok, as well as building of an annex to the stop logs storage/depot. The structures/facilities that the works are going to be executed on include:
— sluice and ship lock and stop logs storage/depot.
Within the rehabilitation of the sluice and ship lock it is planned to execute the following works:
— construction works
— mechanical engineering works
— electrical engineering works.
Within annex building to the stop logs storage/depot it is planned to execute the following works:
(c) Place of execution of the works - Land plots 8073, Cadastral Municipality Bezdan;
— main design — rehabilitation of the Šebešfok ship lock and sluice
— preliminary design — electrification of the Šebešfok ship lock and sluice
— the design for building permit and performing design — building of an annex to the storage/depot within the Šebešfok ship lock and sluice.
The projects have been elaborated by the Institute “Mihajlo Pupin” Belgrade and IBS — Institute for security and protection at work Novi Sad.
Gosa Montaza AD Beograd as consortium leader signed the subcontracting agreement for works related on anti-corrosion protection of floodgate and sluice in Bezdan and Sebesfok facility.